Particle size of less than 3mm magnetite, pyrrhotite, roasted ore, ilmenite, coal, non-metallic ore and other materials. Inspection of PTMS Magnetic Separator before startup. Before the magnetic separation equipment is put into operation, it is necessary to carefully check whether the installation meets the design requirements, such as levelness, verticality, and inclination of the equipment. Whether the valves of the water supply and sewage pipes are moving freely,
The tightness of each fastening bolt is appropriate to play a good fastening role; Equipment inside and outside all places should be clean without debris; Pipeline channel smooth to keep unimpeded; Pipeline connection is correct and reliable; PTMS Magnetic Separator check after starting, the magnetic separator is turned and rotates well; The motor test is completed, the cable is good, the motor steering, bearing lubrication, overcurrent protection and the ball mill match all meet the requirements;
Prepare enough lubricating oil, check each filling point, lubricating oil is sufficient to meet the requirements. PTMS Magnetic Separator pipeline inspection, pipe and equipment connected through, no water leakage, leakage phenomenon, flange gasket at each connection is well sealed, bolt fastening; All valve debugging check, the whole operation is flexible, the direction is correct.
Contact: DELLA
Mob: +86-13929907491
No.9, Factory 2, Shijin Industry Park, Shishan Town, Nanhai District, Foshan City, Guangdong, China
Ph: +86-13929907491
E-mail: Sales@powtechina.com