Foshan Powtech Technology Company Limited.
Home > News
Installation method of the full magnetic drum PTMS MAGNETIC SEPARATOR base
Time: Jul 19,2024

Silica Sand Processing Line

Installation method of the full magnetic drum PTMS MAGNETIC SEPARATOR base: the rotating center line of the drum body should be perpendicular to the axis of the belt conveyor. The lead line of the full magnetic drum shall be protected from the junction box by metal hose or other means, and the hose shall be fixed on the rack. The full magnetic roller should be reliably grounded. In particular: full magnetic rollers are allowed to be installed at a level of less than 5 degrees;


PTMS MAGNETIC SEPARATOR

If the tilt is more than 5 degrees, the internal structure should be specially treated. For the full magnetic drum PTMS MAGNETIC SEPARATOR with a power of more than 18.5KW, if it needs to be lifted, the material of the support should be steel. The permanent magnet drum base installation method is understood only, in the future when the installation will be very simple, if you do not understand, when the installation may damage the base,


what is magnetic separation in chemistry?

Therefore, the above knowledge should be understood first before the installation. In the full magnetic drum PTMS MAGNETIC SEPARATOR sorting, the loss of raw materials is unavoidable, which needs to effectively prevent, then need the magnetic separator equipment component of the ore funnel, in the prevention of the loss of raw materials played a very important role,

Contact: DELLA

Mob: +86-13929907491

sales@powtechina.com

FOSHAN POWTECH TECHNOLOGY COMPANY LIMITED.

No.9, Factory 2, Shijin Industry Park, Shishan Town, Nanhai District, Foshan City, Guangdong, China
Ph: +86-13929907491
E-mail: Sales@powtechina.com

QR code

Copyright © Foshan Powtech Technology Company Limited. All Rights Reserved.   Sitemap   XML