Before using the suction PTMS magnetic separation in winter, it is necessary to make preparations to ensure that the equipment can run smoothly after the startup. The key to the preparation is to do the inspection of each part. The preparation before the boot of the suction magnetic separator in winter is as follows:
1,Adjust the chain tightness to see if it is appropriate.
2, ensure that the PTMS magnetic separation magnetic roll and adhesive roller card should be firm, the position is correct, the dust mat is good.
3. Check the electrical system (motor, distribution box, safety lamp, wire, grounding wire) to see if it is good, no short circuit, and the surrounding environment should be clean.
4. Turn on the total power supply, start the oil pump and other motors in order, and pay attention to the running state. If the abnormal condition is found, the abnormal condition should immediately turn off the power supply, and it can only start after inspection and treatment.
5. PTMS magnetic separation Start in time and space for 3 minutes to check whether the actions of each part are normal, whether the sound is normal, and whether the coolant is smooth.
6. When loading the grinding wheel, it is necessary to pad 0.5-1.0mm paper pad between the grinding wheel and the pressing plate, and tighten the special wrench evenly. It is not allowed to tighten the lengthened pipe, so as not to cause swelling of the grinding wheel.
Contact: DELLA
Mob: +86-13929907491
No.9, Factory 2, Shijin Industry Park, Shishan Town, Nanhai District, Foshan City, Guangdong, China
Ph: +86-13929907491
E-mail: Sales@powtechina.com